When a study calls for a high volume of respondents quickly or rapid international reach, Emporia's platform Levada delivers fraud-screened sample from vetted partners.
Talk to the TeamEmporia's first-party community of verified B2B and healthcare practitioners covers most studies on its own. When a request calls for rapid international reach, or a study needs to fill a large sample size quickly, we tap trusted third-party partners through Levada. You can work with a single partner and one quality standard.
If a project requires a large sample that needs to be filled as quickly as possible, Levada adds the reach to fill your quotas on schedule.
When a study needs multi-country fieldwork on short notice, Levada connects with vetted partners who have coverage in those markets.
Third-party respondents must pass multiple layers of fraud checks before they can ever reach your study or your data.
In addition to working with fully vetted sample partners, Levada also ensures every third-party respondent is screened with Emporia's multi-layer anti-fraud technology. This rigorous process filters out bots, bad actors and low-quality respondents before your study begins.
Confirms the respondent's work email belongs to a real, established company.
Checks each respondent's claims against live LinkedIn profile data.
Matches each respondent against records of past and flagged identities.
Catches people who create many accounts from one device.
Flags hidden connections that fraud farms rely on.
Spots AI-generated profiles and fake personas built to slip past standard checks.
Reads open answers to catch gibberish, bots and low-quality replies.
Watches for rushed answers, straight-lining and inconsistencies.
Sends unclear cases to our sampling experts for review.
Levada connects sample providers to Emporia's B2B and healthcare studies that span many methodologies, including surveys, interviews and focus groups. Your members can access a higher volume of earning opportunities, and with Emporia's wide range of studies and sample needs, they'll increase their likelihood of qualifying based on their professional background.
Give your panelists access to a higher volume of studies, matched to their title, industry, seniority, geography and other criteria.
Send respondents through direct links, generate links in bulk and see status updates in real time, all from one dashboard.
Levada doesn't charge platform fees, so you can help your audience access more opportunities without increasing your costs.
Levada's workflow tools keep your projects, exit links and performance metrics in one place, so you can launch faster and fill quotas on schedule.
Verify sample IDs instantly before you launch. Testing confirms your links pass IDs and status codes correctly before panelists enter a study.
Track completes for each of your audiences in real time, so you can see which segments are performing and decide where to focus your next allocation.
Set, update, copy and save every exit link in one place. When a project changes, you update the link once instead of tracking down old versions in email.
Share each allocation's performance with your team in one click, so everyone works from the same numbers without exporting a spreadsheet.